Filter By Types
Filter By Category

Johnson Controls and LeanDNA Build a Digital Thread to Connect 14 Sites and 800+ Global Suppliers
CASE STUDY Johnson Controls (JCI) is a world leader in creating safe, healthy, and sustainable spaces with the world’s largest

How to Reduce Inventory in Manufacturing: Spirit AeroSystems Reduces Inventory by 16%
“LeanDNA’s modern, centralized supply chain planning solution gave us the insights necessary to adjust inventory, streamline supplier collaboration, and improve

HNI Achieves Fast ROI with LeanDNA’s Inventory Optimization Solution
CASE STUDY – Inventory Optimization Solution HNI Achieves Fast ROI with LeanDNA Inventory Optimization Platform “We want our team members

Case Study: HySecurity Improves On-Time Delivery with 83 Percent Shortage Reduction in 3 Months
CASE STUDY | Improved On-Time Delivery Nice I HySecurity Improves On-Time Delivery with 83 Percent Shortage Reduction in 3 Months

Case Study: Automotive Manufacturer Saves $10 Million by Improving Visibility and Efficiency
CASE STUDY Global Automotive Manufacturer Drives Visibility and Efficiency to Save $10 Million A worldwide leader in automotive manufacturing with

JR Automation Achieves The Benefits of Lean Six Sigma Execution
CASE STUDY – Lean Six Sigma How JR Automation Operationalizes Lean Six Sigma With LeanDNA JR Automation was preparing to

Graco’s Fast Implementation of Leading Supply Chain Optimization Technologies
CASE STUDY – Fast Implementation of Leading Supply Chain Optimization Technologies An Interview With Jason Irvan, Director of IT at

Case Study: Aerospace Manufacturer Frees Up $80M in Working Capital
CASE STUDY | Aerospace Manufacturer Aerospace Manufacturer Drives Change in Working Capital Free Cash Flow by $80M with LeanDNA This

Medical Devices Manufacturer Saves $700K in First Month with LeanDNA Supply Chain Automation
CASE STUDY | Medical Device Manufacturer Medical Device Manufacturer Saves $700K in First Month with LeanDNA’s Supply Chain Automation An

Aerospace Manufacturer Inventory Cost Reduction Case Study
Inventory Cost Reduction Case Study Aerospace Manufacturer Saves $20M in 90 Days with LeanDNA A leading aerospace manufacturer had undergone
- 1
- 2